Anapos have been appointed by RTL to install 4 sauna's and 2 steam rooms at The Grove Hotel and The Runnymede-on-Thames hotel. They were appointed as a result of successfully tendering for the installations on the basis of style of their proposition and on cost.
The installations involved the removal of existing cabins and the installation of new ones. The cabins were individually designed for the location and incorporated cladding, heat units and lighting. On each occasion there were particular style and design requirements all of which were well met. The installations were scheduled for night time to avoid any business interruption and the on-site installation team were efficient, effective and worked in conjunction with other works that were being undertaken at the same time.
The completed rooms met with expectations and with the design intent and any minor remedial snagging has been addressed promptly.